Pipe bridge Maintenance

PCR are currently working on the BGRT project at Sellafield which involves refurbishing pipe bridges crossing throughout the site.

We are currently contracted to carry out the refurbishment repairs to a 160 metre long redundant Pipe Bridge to enable re-use as a permanent walkway.

Works include;

  • Size reduction of redundant 20” ventilation duct
  • Removal of vegetation
  • Installation of a permanent hand rail system
  • Installation of Styrofoam blocks to voids
  • Application of a 6 layer Waterproofing system consisting of 600 Primer, S-VAP 700E, Reemat fibre glass matting, Decothane Ultra and Inhibiting Grit

All Steelwork is supplied with CE marking and all aspects of the contract are carried out by our own in-house SQEP team.