Skip to main content

Flare Tip Replacement, Middle East

A contract to carry out the flare tip and molecular seal replacement has been completed on 2 flare stacks in the Middle East within the programme requirements.

PCR were awarded the contract to replace the flare tips and molecular seal on 2No flare stacks during a shutdown in Yanbu. The works were carried in house by our rigging team using industrial rope access and 200tonne mobile cranes. The stacks were subject to further general maintenance works which included NDT of the guy wires and the internal cleaning and grit blasting of the 2No knock-out drums. To provide protection of the guy wires these were coated with a pretective grease. The project was completed within the turn around period, to the clients budget and without an LTI.